A motor-driven double beam overhead crane with grab bucket is a heavy-duty piece of equipment used for lifting and moving bulk materials. This crane is available in 30-ton and 50-ton capacities and is designed for industrial applications that require frequent and heavy lifting.
The double-beam design of this bridge crane provides increased stability and strength, allowing for larger capacities and extended reach. The motor-driven system provides smooth movement and precise control. The grab bucket attachment allows for easy picking up and releasing of loose materials such as gravel, sand, or scrap metal.
This crane is commonly used in construction sites, metal processing plants, and port facilities for material handling applications. Safety features such as overload protection and emergency stop buttons are also included to ensure safe operation.
Overall, this motor-driven double girder bridge crane with grab bucket is a reliable and efficient option for industrial material handling needs.
The 30 ton and 50 ton motor-driven double beam overhead crane with grab bucket is widely used in various industries that involve the lifting and movement of heavy goods. The grab bucket is designed to pick up bulk materials such as coal, sand, ores, and minerals.
In the mining industry, the crane is used to transport raw materials from the mining site to the processing plant. The crane is also used in the construction industry for the movement of heavy concrete blocks, steel bars, and other construction materials.
In the shipping industry, the crane is utilized for loading and unloading cargo from ships. In ports, the crane is an essential equipment for managing containers, ensuring efficient handling of goods.
The crane is also used in the power and energy industry to transport heavy equipment and materials such as transformers, generators, and wind turbine components. The crane’s ability to carry heavy loads and operate at high speeds makes it a vital tool in the industry’s operations.
Overall, the 30 ton and 50 ton motor-driven double beam overhead crane with grab bucket have proved to be an indispensable tool for various industries that require the handling of heavy materials.
The manufacturing process of the crane involves several stages, including design and engineering, fabrication, assembly, and installation. The first step is designing and engineering the crane to meet the customer’s specification. Then, the raw materials such as steel sheets, pipes, and electrical components are procured and prepared for fabrication.
The fabrication process involves cutting, bending, welding, and drilling the steel components to form the superstructure of the crane, including the double beam, trolley, and grab bucket. The electrical control panel, motors, and hoist are also assembled and wired into the crane’s structure.
The final stage of the manufacturing process is the installation of the crane at the customer’s site. The crane is assembled and tested to ensure it meets the required operational standards. Once testing is complete, the crane is ready to operate.
In summary, the 30-ton to 50-ton motor-driven double beam overhead crane with grab bucket undergoes a rigorous manufacturing process involving various stages of fabrication, testing, and installation to ensure it is reliable, durable, and meets the customer’s requirements.