Double girder overhead cranes can handle heavy loads safely and accurately. The double girder overhead crane has superior performance, compact structure, light weight, reliability and operation, and can meet various working conditions. It can reduce the overall investment in the factory, improve production efficiency, reduce maintenance costs, and save operating energy consumption.

sevencrane-double girder overhead crane 1

The features of the double girder overhead crane:

Compact structure, simple maintenance, low power consumption and wide speed range.

The running brake is smooth and effectively reduces the shaking of heavy objects, reduces load swing, and improves hoisting efficiency.

Double girder overhead crane is flexible, adaptable through different installation variants.

Low-maintenance, low-noise direct drive with disc brake and centrifugal mass.

Worldwide network of certified partners, crane manufacturers and system builders.

sevencrane-double girder overhead crane 2

Before using the double girder bridge crane:

Be sure to check various spreaders before work. Make sure the spreaders are complete and intact. If it is defective, it will not be possible to work as a crane.

Check the condition of the rope. Make sure the rope of the 10 ton overhead crane is secure and not loose or broken. If you tie an object with an edge, you need to add a protector between the object and the rope to prevent the rope from breaking.

Determine the center of gravity of the weight. This can avoid the phenomenon of diagonal pulling, and special lifting items require staff to operate.

When lifting objects, do not rush. Be sure to wait a while for the goods to stabilize before continuing. No debris is allowed on heavy objects, and no one is allowed to stand on them. When using the 10 ton overhead crane to lift goods, irrelevant personnel are not allowed to pass under the object.

Work safety measures should be improved. For example, workers must wear safety helmets, professionals must provide unified command, and various departments must coordinate their work. When the object is lifted off the ground, check whether the wire rope and other components are safe. If unsafe, stop the double girder overhead crane for inspection.